Did a video inspection of sewer from 6” outside clean out in front landscape confirmed with pan and tilt camera hole in elbow/drop before main also cracking in clay pipe before drop. Saw square tie ins just below drop into main could be curb drains would need to confirm with village if they are active drains or not before lining. Either install silicate patch liner or remote start liner 20’ downstream and line last 10-15’ inversion lining.