9-3-2025: Cleaned and measured sewer in preparation for lining from 6” pvc clean out on right side of house(6’8”deep) one sidewalk about 90’ to city main. Starting liner near clean out and ending just before city main. Reinstate x1 connection at 7’ in pvc tie in from house, lining over old downspout and possible drain tile connections has newer pit and pump in house, also lining over clean out at 39’ in landscape bed we found has roots on riser side of tee.