5-27-25 Measured sewer line in preparation for sewer lining. 6-20-25 Inserted a 6” liner through the existing outside clean-out extending approximately 70’ downstream ending before the city main. Inserted a 4-6” liner through the existing outside clean-out extending upstream approximately 42 feet ending in the 4" PVC near the front of the house.