PERFORMED PMP INSPECTION ON PACKAGE ELECTRIC HEAT AND CONVENTIONAL AC UNIT TESTED HEAT STRIPS FOR CORRECT POWER CONSUMPTION CHECKED RUN CAPACITOR FOR PERFORMANCE CHECKED AMP DRAW OF BLOWER MOTOR VERIFIED TEMPERATURE RISE VERIFIED UNIT RUNS IN COOLING UNIT RUNNING NORMALLY AT THIS TIME. NO RECOMMENDED REPAIRS AT TIME OF INSPECTION.