155 E Broadway Rd.
Mesa, AZ 85210
480-832-9659

Job Locations
for chandler, az


Map of Chandler AZ
Stuart M.

Stuart M.


Job Checkin

PERFORMED PMP INSPECTION ON TWO SPLIT GAS AC UNITS CHECKED AMP DRAWS OF MOTORS TESTED RUN CAPACITORS TO BE WITHIN MANUFACTURERS RANGE VERIFIED TEMP SPLIT ACROSS COILS CLEANED OUTDOOR COILS TIGHTENED ELECTRICAL CONNECTIONS CHECKED IN RUSH AMPS OF COMPRESSORS INSPECTED CONDITION OF UNITS UNITS RUNNING IN COOLING AT TIME OF INSPECTION. DOWNSTAIRS UNIT HAS WEAK 5 MF RUN CAPACITOR. CAPACITOR WAS REPLACED AT TIME OF INSPECTION. WHILE RUNNING MOTOR WITH WEAK CAPACITOR MAY HAVE CAUSED PERMANENT INTERNAL DAMAGE. WEATHER MASTERS RECOMMENDS FOLLOW UP INSPECTION IN FALL FOR HEATING SIDE OF SYSTEM.