PERFORMED PMP INSPECTION ON TWO PACKAGE GAS AC UNITS CHECKED AMP DRAW OF MOTORS TESTED RUN CAPACITORS TO BE WITHIN MANUFACTURERS RANGE VERIFIED TEMP SPLIT ACROSS COILS CHECKED IN RUSH AMPS OF COMPRESSORS TIGHTENED ELECTRICAL CONNECTIONS INSPECTED CONDITION OF UNITS BOTH UNITS RUNNING NORMALLY IN COOLING AT TIME OF INSPECTION. WEATHER MASTERS RECOMMENDS FOLLOW UP INSPECTION IN FALL FOR HEATING SIDE OF SYSTEM.