PERFORMEDC PMP INSPECTION ON TWO PACKAGE CONVENTIONAL AC AND GAS FURNACE UNITS. CHECKED AMP DRAWS OF MOTORS TESTED RUN CAPACITORS FOR PERFORMANCE WITHIN MANUFACTURES RATING TIGHTENED ELECTRICAL CONNECTIONS VERIFIED TEMP SPLIT INSPECTED CONDITION OF UNITS WEST UNIT HAS OFM AT MAXIMUM AMP RATING (1.5) AND EAST UNIT HAS DUAL RUN CAPACITOR TESTING AT LIMIT OF MANUFACTURE RATING. BOTH ISSUES WILL BE TESTED AGAIN AT NEXT INSPECTION TO VERFY NO FURTHER LOSS OF PERFORMANCE. UNITS RUNNING IN COOLING AT TIME OF INSPECTION