Good service all around, explained what needed to be done and how much cost would be. I was disappointed that his boss told him to forego injecting dye into the system to check for leaks since he seemed to have fixed the problem. I am selling the house and would much prefer the peace of mind knowing that there are positively no more leaks.
Investigate furnace and hot water exhausting into the mechanical room Conclusions of the investigation are; Not enough makeup air in the building & the entire building is in a negative vacuum drawing air in any place it can including down the flue pipes. Remove water heater flu pipe from the combined 644 vent Y designed for the two 100k/120k 80% furnaces and rebuild sealed 4-in 26 gauge vent pipes Replace original 6-in b vent flu cap on roof Remove obstructions from 10-in combustion air in mechanical room that was installed on the roof Clean and shop vac both D&E furnaces Completely remove April Air 600 bypass style humidifier with manual control and all low voltage control wiring including drain and copper water line supply. Patch all holes in supply and return ducts Investigate no high voltage on left side furnace D Run test both systems Both furnaces run in fairly good condition with new air filters installed today Mechanical room with 4-in combustion air at ceiling height
2011 Carrier Infiniti heating ESA PMI silver plan inspection Immediately upon arrival and opening of the furnace cabinet door heavy puddling of water was found pooling below the exhaust blower assembly. Water drips were witnessed in the vicinity of the left hand side drain nipple but the actually could not be positively identified. Pulled combustion blower assembly for water leak inspection and resealing of the blower housing in that vicinity. During inspections with motor assembly out of the equipment a torn hose was also found on the bottom side of the trap assembly inlet nipple. Temporarily addressed the torn hose and reassembled equipment for the remainder of the heating equipment PMI Resurface flame sensor and inspect ignition system Test run equipment and heat mode Test run humidifier water flow, #10 water panel is not new but is in good condition, percentage set to 45 on carrier Infinity control Clean water, wire brush the rust, treat with rustoleum paint provided by home
Install new Bryant HVAC system Air Handler: FJ4DNXB30L00EBAA Serial: 3724F39800 Heat Pump: GH5SAN43000AABAA 14.3 SEER2 Single Stage Heat Pump Serial: 2023X49296 Aux Heat: 15KW *Honeywell thermostat *Reconnect to existing high voltage electric *Transition to existing supply and return ductwork *Start up and commission new system 10 Year Bryant manufacturers parts warranty (Annual maintenance must be performed) 2 Year Westin Air labor warranty (Annual maintenance must be performed)
Blower motor had caught fire inside of unit damaging various parts of it. Due to age and condition of unit. Recommend replacement of entire system.
American standard unit Blower belt stretched and caused the system to freeze up. Changed belt with a new one left inside the unit. BX55 belt. Shut cooling off at the stat and left blower on. Went through second unit (unit #8). Stage 2 cooling 100% out of refrigerant. Pressure tested with nitrogen and performed leak search. Service port on Compressor discharge is leaking. No other leaks found. Left nitrogen in the system and disconnected the contactor so the Compressor will not run while pressurized with nitrogen.
20 ton American Standard commercial rooftop gas-electric packaged unit frozen solid from a stretched blower belt. Lack of airflow caused the evaporator to freeze up.
Replacing 460v variable speed blower motor on Bryant Legacy Line Rooftop unit in Reynoldsburg, OH
Heating and Cooling maintenence on large 20 ton American Standard Rooftop unit in Reynoldsburg, OH
Refrigeration diagnostics on Carrier Rooftop unit in Reynoldsburg, OH.
Annual maintenance on multiple Carrier, Bryant, and Trane commercial RTUs in Reynoldsburg, OH
Air conditioner coil cleaning and leak testing.