725 Kintner Parkway
Sunbury, OH 43074
614-827-1259

Local Reviews

Rated 4.9 out of 5 stars based on 345 customer reviews

Excellent Service by Gregg and his colleague

Greg and his colleague did awesome job balancing and providing recommendations. He also uncovered an issue that was kind a hidden.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service

We have used Weston air on several properties and the service is always professional and mechanically well done. The price is fair. What we like is that it’s very realizable,

  • Overall Experience
  • Quality
  • Price
  • Convenience

Outstanding Company!

We have been a customer of Westin Air for four years now and recently had our old HVAC system replaced by Westin Air. They are the most professional HVAC company we’ve ever had with outstanding service and technical excellent. When I had a question about a new sound from our new system when turning on the furnace, Wes the owner personally came to the house to check it out (the sound was normal to the new system). What service! If you have any HVAC needs, call Westin Air.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Chris was great

Showed up in a timely manner and explained everything very well

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great service!

Always there when I need them. And always ready to help out when I am in a pinch. Great guys to work with.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Attention to detail

Chris has a great attention to detail and is always willing to help us with our Energy Star Program

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great Service, Quality personnel

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent Service Professional employees!

Very responsive and gets the job done!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service

Service man showed up on time. Found part to be replaced and explained the problem. Also, gave us an overall status of the unit.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great communication

Working with Chris is always easy. He is almost always available to talk and responsive to when I have something I need help with. Willing to answer any questions I have and always trying to make things right for me and the client.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Quick Response & Excellent Service!

Westin Air continues to exceed my expectations for responsiveness and quality of service! Everyone is extremely friendly, understand and accommodating to help make the situation right! I would highly recommend Westin Air to anyone who wants a reliable, friendly and HONEST HVAC company!!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great service and quick response!

Chris is quick to respond and is a man of his word. He is passionate about what he does and is quality driven.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great Experience!

Chris was Amazing!!!

  • Overall Experience
  • Quality
  • Price
  • Convenience

A professional in your own neighborhood

I, Seth Peters, am a 18-year veteran and Employee #1 of Westin Air. We specialize in WaterFurnace geothermal, daiken and mitsubishi many split and whole home equipment, new construction and replacement installs

  • Overall Experience
  • Quality
  • Price
  • Convenience

Takes Pride

Chris takes pride in his works and cares about things getting done properly!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations

Graham M.

Graham M. Job Checkin

Cooling preventative maintenance performed Check filter -20x25x4 clean Check coil for any buildup debris in drain pan and flush with water Set up thermometers Rinse down outdoor coil with garden hose Check capacitor MFD -45+5 @ 42.31+2.61 old - new today Check OD fan Amp - 0.92 Check compressor Amp - 8.31 Verify pressures and HP-SC/LP-SH Delta T - 18° The Air handler and AC are in optimal running conditions.


Brandon P.

Brandon P. Job Checkin

Gentleman on site lead me to apartment system in crawl space with compressor out by the pool. Checked indoor unit. Air filter, air flow, and drain system is good. Inspected outdoor compressor unit. Coils are clean and there are no issues found with outdoor equipment. After doing a walk through of the apartment, there are four 4x12 vents on the first floor where most of the cool air is coming from and only two vents on the second floor, one 4x12 and one approximately 2x12 toe kick vent. Attempted to adjust the 4x12 floor vents om first floor for partially close them down to force more air upstairs. Current registers are siezed open as adjustment screw and attempting to manually move the louvers does hot work. Will need new 4x12 registers on first floor to perform air balance. Roy asked about duct cleaning. Westin Air recommends Fresh Air Corps. 614-322-3828


Nate G.

Nate G. Job Checkin

Diagnosed system extremely low on refrigerant. Got authorization to recharge and add sealant/dye System took 4lbs 4oz of R410a refrigerant Condenser coil is not very dirty, filter was OK Recommend using 16x25x5 MERV8 filters. The MERV16 currently in there puts a lot of strain on the blower motor. Signed up for Gold maintenance

Diagnosed system extremely low on refrigerant. 
Got authorization to recharge and add sealant/dye
System took 4lbs 4oz of R410a refrigerant 
Condenser coil is not very dirty, filter was OK
Recommend using 16x25x5 MERV8 filters.  The MERV16 currently in there puts a lot of strain on the blower motor.
Signed up for Gold maintenance

Graham M.

Graham M. Job Checkin

Cooling preventative maintenance performed Check filter -16x25x1 new today Check coil for any buildup debris in drain pan and flush with water Set up thermometers Rinse down outdoor coil with garden hose Check capacitor MFD -45+5 @ 45+5 Verify pressures and HP-SC/LP-SH Delta T - 18° The Air handler and AC are in optimal running conditions.


Jason D.

Jason D. Job Checkin

Install Daikin Aurora Ductless System Daikin Heat Pump Model #: RXT12AVJU9 Serial #: Y043969 12,000 BTU's 20 SEER; 13 EER; 12.5 HSPF Daikin Wall Mounted Air Handler Model #: FTXV12AVJU9 Serial #: Y096810 Hand Held Remote Control Long Life Washable Filter 12 Year Parts & Compressor Warranty 2 Year Labor Warranty

Install Daikin Aurora Ductless System
Daikin Heat Pump
Model #: RXT12AVJU9
Serial #: Y043969
12,000 BTU's
20 SEER; 13 EER; 12.5 HSPF
Daikin Wall Mounted Air Handler
Model #: FTXV12AVJU9
Serial #: Y096810
Hand Held Remote Control
Long Life Washable Filter
12 Year Parts & Compressor Warranty
2 Year Labor Warranty

Jason D.

Jason D. Job Checkin

Install New Bryant 2 Stage Gas Furnace Model #: 926TC48060V17 Serial #: 2125A49030 60,000 BTU’s - 96% AFUE Installation: * Reconnect to existing gas line and high voltage electric * Transition to existing supply and return ductwork * Start up and commission new system * New PVC Furnace Vents * 1" Standard Filter Rack Warranty: 20 Year Bryant manufacturers Heat Exchanger Warranty (Annual maintenance must be performed) 10 Year Bryant manufacturers Parts Warranty (Annual maintenance must be performed) 2 Year Westin Air Labor Warranty (Annual maintenance must be performed)

Install New Bryant 2 Stage Gas Furnace
Model #: 926TC48060V17
Serial #: 2125A49030
60,000 BTU’s - 96% AFUE

Installation:
* Reconnect to existing gas line and high voltage electric
* Transition to existing supply and return ductwork
* Start up and commission new system
* New PVC Furnace Vents
* 1" Standard Filter Rack

Warranty:
20 Year Bryant manufacturers Heat Exchanger Warranty (Annual maintenance must be performed)
10 Year Bryant manufacturers Parts Warranty (Annual maintenance must be performed)
2 Year Westin Air Labor Warranty (Annual maintenance must be performed)

Jason D.

Jason D. Job Checkin

Install New Bryant 2 Stage Gas Furnace Model #: 926TC60080V21 Serial #: 2225A45934 80,000 BTU’s - 96% AFUE Installation: * Reconnect to existing gas line and high voltage electric * Transition to existing supply and return ductwork * Start up and commission new system * Install new 2" PVC Pipe for Furnace venting Warranty: 20 Year Bryant manufacturers Heat Exchanger Warranty (Annual maintenance must be performed) 10 Year Bryant manufacturers Parts Warranty (Annual maintenance must be performed) 2 Year Westin Air Labor Warranty (Annual maintenance must be performed)

Install New Bryant 2 Stage Gas Furnace
Model #: 926TC60080V21
Serial #: 2225A45934
80,000 BTU’s - 96% AFUE

Installation:
* Reconnect to existing gas line and high voltage electric
* Transition to existing supply and return ductwork
* Start up and commission new system
* Install new 2" PVC Pipe for Furnace venting

Warranty:
20 Year Bryant manufacturers Heat Exchanger Warranty (Annual maintenance must be performed)
10 Year Bryant manufacturers Parts Warranty (Annual maintenance must be performed)
2 Year Westin Air Labor Warranty (Annual maintenance must be performed)

Brandon P.

Brandon P. Job Checkin

Preventative maintenence inspection performed on 2014 Carrier furnace and 2015 Carrier AC systems. All measurable parameters have measure within specifications and properly operating. No issues found while performing inspection. Current 20x25x4 air filter is in good condition. Furnace operates properly in heating, and AC operates properly in cooling. All systems are operating properly, efficiently and ready for use. Detailed specifics for each unit can be found on individual inspection report paper.

Preventative maintenence inspection performed on 2014 Carrier furnace and 2015 Carrier AC systems. All measurable parameters have measure within specifications and properly operating. No issues found while performing inspection. Current 20x25x4 air filter is in good condition. Furnace operates properly in heating, and AC operates properly in cooling. All systems are operating properly, efficiently and ready for use. Detailed specifics for each unit can be found on individual inspection report paper.

Nate G.

Nate G. Job Checkin

Installed new High pressure safety switch and Compressor temperature probe System is operating normally at this time No active alerts currently


Graham M.

Graham M. Job Checkin

Cooling preventative maintenance performed Check filter - 16x25x1 Check coil for any buildup debris in drain pan and flush with water Set up thermometers Rinse down outdoor coil with garden hose Check capacitor MFD - 35+5 @ 34.74+4.87 Check OD fan Amp - 0.61 Check compressor Amp - 4.31 Verify pressures and HP-SC/LP-SH 321-12° / 119-16° Delta T - 19° The Air handler and AC are in optimal running conditions.


seth p.

seth p. Job Checkin

Outdoor equipment not running with a call for cooling 440 volt power supply 60 + 7.5 is swollen and shorted to open circuits on all terminals Install replacement Mars brand power supply and run test cooling mode


Nate G.

Nate G. Job Checkin

Cooling maintenance for three trane systems Filters are good Blowers clean Verified drains are clear Checked dehumidifier North system was producing 10⁰ delta T. Adjusted blower speed. Now getting 16⁰ delta T Also added small amount of refrigerant to that system to balance charge to manufacturer spec Washed outdoor coils with water Advised keeping laundry room vent closed to push more air to the basement bedroom. Concerned that bedroom is hot in the summer. All three systems are operating within manufacturer's specifications at this time


Nate G.

Nate G. Job Checkin

Performed cooling maintenance on three Daikin systems Washed filters on mini split units Used self-rinsing evaporator coil cleaner on mini split indoor coils and Daikin Fit indoor coil Verified drains are flowing properly Filter for upstairs air handler was clean Blower is clean No stored fault codes Washed outdoor coils with water


seth p.

seth p. Job Checkin

Can


seth p.

seth p. Job Checkin

Check for no cooling later in the afternoon. Homeowner State system was working but throughout the day yesterday it got hotter on the second floor throughout the day. Aprilaire two stage thermostat was turned off upon arrival today. Initial inspection shows all systems in good order Thermostat test run turned on equipment as expected after the normal short cycle delay and ran as expected producing 51 supply temperature. Ground loop water pressure is at 28 PSI with two PSI pressure drop through the heat exchanger and a one pump FC flow center. Climate master 049 2 stage 4 ton equipment has been intentionally installed and wired at the thermostat and the variable speed blower driver board to run in low capacity heat pump compressor mode only. Y2 is not attached at the thermostat or the control board in the air handler. Test run blower system in fan only and cooling mode and confirm correct CFM No battery level indicators on the thermostat however it appears they may be starting to l