Dustin came out to preform my annual generator service he was very knowledgeable and professional.
Found that the ATS was not transferring over to emergency when utility source was inturrupted. Pulled wiring schedmatics out and tested points for power. Determined that the ASCO board and diode bridge rectifier has failed. Need to replace both. The generator started up and ran all 5 times, however, the generator is black-smoking pretty bad at start up and I recommend performing a 2-hr load bank test.
Arrived on site for service, found generator running and low on fuel. Added 100 gallons
#1 service. Generator is working properly. Oil will need to be changed next service again due to the moisture content.
#2 service. Generator is working properly.
This generator is putting out 393vac. The voltage ragulator (AVR) needs replacing. Once the AVR is replaced, we will need to apply the load bank to fine-tune the voltage
Generator Light Towers need new battery, Oil filter, Fuel filter, Thermostat, Gasket, and Water pump and gasket
R&R rotor/stator and related parts, then load bank generator CM-3169468 JB46256528
Need quote for Woodward Governor repair and Labor.
Generator Ats needs New smart management module. and well and a new wire harness.
Quote for a deep sea controller
Generator needs new Speed sensor. and adaptor.
Portable Generator needs new engine. (WARRANTY)