Completed the start up and installed the mobile link LTE while on site tested and everything is good at this time.
INSTALLATION OF 24KW GENERATOR W/ 200 AMP TS O/D SUB PANEL BATTERY PAD SEMI-ANNUAL PMA 7 YR WARRANTY
INSTALLATION 24KW GENERATOR W/ 200 AMP TS SEMI-ANNUAL PMA BATTERY GRP 26 PAD TRENCHING