(2) PROVIDE AND INSTALL CADET WALL HEATER (8) PROVIDWE AND INSTALL RECESSED CAN LIGHTS (9) PROVIDE AND INSTALL QUADS (6) PROVIDE AND INSTALL SWITCHED OUTLETS FOR LIGHTS IN CEILING- MEZZANINE AND BASEMENT AREA (2) RELOCATE EXISTING 8' FIXTURES (1) PROVDE AND INSTALL CIRCUIT FOR GAS HEATER AND SWITCHED DISCONNECT (1) ROUGH AND INSTALL OFCI FAN ALTERNATE LINE ITEM INCLUDED FOR (1) SET OF 3WAY TRAVELERS FOR FRONT LIGHT TO OFFICE WALL.