Replace 150Amp Through the Roof Riser - Replace 150Amp Meter Base - Replace Main Grounding System - Permits (NOC,Application, Service Drawings) - Replace 150Amp Service Feeder from the outside panel to the Inside of the house - Install New 50Amp Range Circuit - Install New Whip for the Range - Install Panel Surge Protection - Install A/C Surge Protection