I arrived at the property to complete previously estimate at work. After my arrival I met our safety advisor on site to discuss the scope of work to be performed then I completed the following task. I relocated the existing interior panel to the outside of the home where I installed an outdoor 42 space 200 amp main breaker panel, we also upgraded the electrical service to 200 A which we replace the meter enclosure along with the feeder cables and conduit. We updated the grounding system. After completing those task we labeled the electrical panel accordingly. we also identified the electrical circuit which is feeding a Romax cable which is sticking out through the wall which will have to be disconnected once the window and door company comes on site to remove the existing wood so we can have access to the cable which will be coordinated by our customer. As a courtesy we also replaced the electrical whip going to the sprinkler pump due to the condition that it was in Which wasn’t safe s