Finishing up an install of a new receptacle in a commercial space. I ran MC (metal clad) cable from the main electrical panel to the installation site to ensure compliance with safety standards. The MC cable was securely fastened along the route and properly grounded. After mounting the receptacle, I conducted a thorough test to confirm its operational safety and efficiency.