9800 Old Dogwood Rd.
Roswell, GA 30075
(770) 667-6937

Our Top Cities


Local Reviews
for dawsonville, ga

Rated 5.0 out of 5 stars based on 55 customer reviews

Excellent service and very professional and polite

Definitely would request Elijah to come back and work anytime

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great service

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great Service

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great experience!

Jacob is knowledgeable, professional and friendly. It was a pleasure working with him.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent Service!

I will like to say thank you to Jordan Nelson for the excellent and professional service he provided me. Excellent performance and a great person!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Diagnosed our problem and gave me an estimate immediately

I can always count on Ben for the type of service new

  • Overall Experience
  • Quality
  • Price
  • Convenience

Good Service!

Our Tech guy was friendly & yet professional. He explained everything after his thorough inspection & gave us a complete report on how our system was working.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service

Myles could not have done a better job! He deserves a raise!!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great Service!

Again, excellent service provided by Ben. He identified and fixed our generator immediately. I wish all repairmen were like Ben.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent Service

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service and great technician

Bruno arrived on time, professional, courteous, didn’t try to upsell unnecessary services and fixed all of the problems quickly. I will use TE Certified Electrical, Plumbing again in the future!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service!

Technician was friendly and professional. Explained everything and answered all my questions.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent Service

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service!

Jesus is Friendly, Courteous, professional, knowledgeable, answered questions and completed services as requested. I highly recommend Jesus!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent service as before

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for dawsonville, ga

Raul A.

Raul A. Job Checkin

Install new Rheem select heat pump system for basement Install new supply and return plenum Install new supply lines and new return lines Mastic seal equipment connections Install new 50ft Lineset drain line and condensation pump Install new thermostat wire and customer provided thermostat Install new outdoor pad and electrical disconnect Install all new boots and registers System start up


Elijah L.

Elijah L. Job Checkin

Customer had a main line blockage that was affecting the entire upstairs bathroom group, customer recently moved in the second blockage that affected the entire upstairs had the septic tank pumped not too long ago, I pulled the toilet upstairs and ran my cable down the main line to clear the blockage after I ran my cable I was able to poke free. The blockage on all the water was draining after testing. All the water is flowing perfectly scheduled for a camera inspection since it’s the second time affecting the upstairs and they will run the camera from the same toilet I pulled. I did not set the toilet all the way back recommend that the customer do not use the toilet until inspection is completed. Customer do have another bathroom upstairs that they can use. I have the toilet over the flange and bolted to the floor, but no water is connected to make it easier for the camera tech to pull the toilet.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.


Isaac A.

Isaac A. Job Checkin

On arrival, it was explained that the water bill had increased. The water company says there is a steady 8 gallons an hour being used. upon investigation, we discovered 100 psi inside the home and no thermal expansion protection. After much investigating the only thing that could be determined at this time was due to the high pressure the master bedroom toilet fill valve had failed. After providing options upon approval, we replaced the pressure regulator, added a thermal expansion tank properly, mounted to the structure of the home and rebuilt the master bedroom toilet. we also replaced the isolation valve for the water heater and re-ran the piping on the cold side going to the water heater in order to get rid of a few inches of polybutylene. We also installed a new whole home shut off valve. Tested everything for leaks and proper function.