Install new supply plenum (no charge) Re route master duct work to re Duce air flow and spread air more evenly through upstairs Remove old air distribution box and install wye’s to increase air flow to bonus room over garage Mastic seal connections Install manual dampers to balance air flow Found main floor and second floor drain lines tied together cleared drain line with 4 gallons of water. CUSTOMER HOLDING OFF ON DRAIN LINE.
Installed Tesla Wall Connector Charger in the garage, left side of the electrical panel.