Initial Services Performed: Semi-Annual Industrial System Inspection Deficiencies Discovered: (1) PCI-25s and (1) PCI-50s are over due for hydro-static testing. Scope of Work Proposed: Perform hydro-static test on (1) PCI-25s and (1) PCI-50s tanks. Labor included removing tanks, shop time and return to install Exclusions: Electrical and /or Plumbing work (if required). Permits (if required). Any changes mandated as a result of an Authority Having Jurisdiction (AHJ) review of the proposed scope of work. Paint Booth Emergency Service Call These deficiencys apply to system 2. System tanks were fraudulently hydro static tested in 2019. The service company who performed the hydro static test in 2019 only applied a label and not a verification collar. I recommend hydro static test be performed again. (1) PCI-25s and (1) PCI-50s system tanks are over due for hydro static testing. - repair Repair of These deficiencys apply to system 2. System tanks were fraudulently hydro static tested in