Gas Station Suppression, Portable Extinguishers, and Emergency / Exit Lights Inspection GAS STATION - QTY 1 ATD80 x 15 LIFT REQUIRED FOR INSPECTION GS TO BE DONE WITH FX FIRE EXTINGUISHERS - QTY 6 FX TO DO WITH GS EMERGENCY LIGHT SPOT CHECK - REPAIR AS NEEDED EL TO BE DONE WITH GS Deficiency for Pyro Chem ATD-80 15: Gas station suppression system is non compliant due both PAC200 need hydro testing. Both are dated new 2006. This test is required every 12 years per nfpa.