Concrete was raised up 4” adjust move to fixtures to try to seal but top section hitting cable drums Set top fixtures so it don’t hit drums but not a good seal and header now covers some of the widow frame Only other solution is to order a section 3” less on the height Move deadbolt up 4” reset limits door is working properly now except for gap at top and window frame been partially covered