Greenway Irrigation, Work done: spring start up and system repaired, broken backflow 2th poppet replaced, 1 burned out solenoid at zone #5 replaced, 3 leaks on the drip line at zone at #7-8 repaired, 25’ of drip pipe added to the new plants, everything tested and working good