Working on an Emergency Water Loss, from a Supply line that broke under the bar in the basement. Vinyl flooring, 2 wet bars affected and possibly baseboards and drywall.
Working on an Estimate for Mold, that may be Causing Health issues in a Family Home.
Starting an Estimate on a Water Leak - Framing nail went into a copper pipe, in time slow leaked, 6-8 weeks, water came in through a window. Water damage on all baseboards, curious of scope. Discontinued carpet.
Working on a Pipe Burst in a Finished Basement, taking ACM Samples today!
Starting on an Emergency Dry-Out from a Dishwasher drainage that came loose and poured water down to basement with warping baseboards. Carpet in basement. hardwood floors in the kitchen
Starting Demolition from a Water Leak, that Affected Water Ducts and Wood Flooring!
Working on Removal of Contents for a Family!
Working on an Estimate for Water Damage that is Causing a Sink-Hole underneath the House!
Starting an Estimate on a Wood Floor Leak, that went into the Duct System!
Estimating a Kitchen drain that was damaged and leaked over time. Lots of visible mold behind cabinets, tile floor, basement ceiling and walls.
Starting a Dry-Out for a A/C Leak in Basement.
Working on Monitoring and taking Asbestos Samples
Working on Demolition from a Water Leak in Finished Basement from Sewer Back-up!
Starting Demolition and Monitoring for a Water Leak from Kitchen area (ice maker line) to Finished Basement that is affecting the Bedroom w/Carpet. CAT 1-2 CLASS 3 — 3 affected areas (kitchen and basement (bedroom).
Estimating a Leak coming through second floor into kitchen ceiling, porch above where it’s coming in.