Cut and removed about 20 feet of 3 inch pvc that was once going to outdoor trailer. Install 3 inch pvc Cleanout to the rest of the existing drainage pipe. Pipe is back to in original state . Tested for any leaks and ensure flowing properly. No further issue were found.