Installed approximately 30-40 feet of gas line.
Hydro-jetted main sewer line from clean out access to basin.
Hydro-jetted main sewer line to clear blockage.
Installed 1/2 horse power ejector pump and float switch. Power rodded branch line through toilet flange.
Power rodded main sewer line from clean out access to clear blockage.
Replaced boiler drain in basement. Augered toilet to clear blockage.
Power rodded kitchen sink line above basement.
Power rodded laundry line in basement to clear blockage.
Rebuilt metal drain, pulled and reset toilet, replaced wax ring, and replaced closet bolts.