Install new 1 1/2" Ball Valve for water shut off. Includes labor, valve and materials.
Provide rough and finish plumbing for: 1 - Three Compartment Sink 2 - Floor Sinks 2 - Hand Sinks 1 - Dump Sink 2 - Floor Drains 1 - Floor Clean-out 1 - Grease Interceptor (Provided by Graham Plumbing) Re-work gas system. Seven fixtures total
Floor Sink with Trap Primer. Includes labor and material. Vent work. Re-route vent for Floor Drain. Includes labor and materials.
Working at local deli / sandwich shop: 1) Install Sump Pump and Mop Sink with faucet. Includes Labor, Pump, Sink, and materials. 2) Ran condensate drain lines from two air conditioning units ending at mop sink.
Install Sump Pump and Mop Sink for local deli.
Cable and clear mop sink drain. Run water and test. Remove and replace mop sink faucet hot and cold cartridges.
Installing floor sinks at local Santa Monica restaurant.