customer approved the $12,000 project for the furnishing and installation of a 6 inch valve as part of this process we removed and then reinstalled the existing Hydrant to ensure precise fit for the new valve. work details All work was conducted during nighttime hours to minimize disruption to tenant water usage,after installation we carefully pressurize the line to ensure there were no leaks. We have documented this process with video evidence confirming the integrity of our work Site conditions and disclaimers due to the ground conditions. We placed a gravel bed to mitigate settling while we performed a thorough cleanup, some residual mud remains due to the unavoidable muddy conditions. Please note that as previously outlined in the estimate, we are not responsible for any asphalt or concrete repairs as well as protective post surrounding hydrant. Furthermore, no warranty can be provided on the existing pipe system due to its age.