install 4 new rotary waste valves for the prep sinks. Aslo the waste lines will be ran in 1” 1/2 copper to the floor sinks nearby. 50’ of copper and 1” 1/2 copper miscellaneous fittings. Scope of work will also include fixing the hand sink drains and discharge line for the ice maker machine and drain line for the ice bin to be ran properly.