Dig 50 foot trench from meter and water bore under walkway. Penetrate brick open drywall. No drywall patch included. Run new schedule 80 1”inch water service from meter to riser inside garage transitioning from schedule 80 PVC to 1” inch copper before entering home. Tie onto existing 1 inch copper riser. Backfill and replace grass test for leaks. No leaks at this time job complete.