Charlie P.

Charlie P. Job Checkin

Installed two fill valves, toilet supply line, toilet flapper, in Oswego.


Charlie P.

Charlie P. Job Checkin

Installed Zoeller M 53 sump pump acting as ejector, in Oswego.


Todd Z.

Todd Z. Job Checkin

Installed new kitchen sink faucet and sink oswego IL

Installed new kitchen sink faucet and sink oswego IL

Charlie P.

Charlie P. Job Checkin

Installed 40 gallon Bradford white water heater, in Oswego.

Installed 40 gallon Bradford white water heater, in Oswego.

Charlie P.

Charlie P. Job Checkin

Installed new repair collar on downstairs toilet flange and reset toilet with one wax ring, in Oswego.

Installed new repair collar on downstairs toilet flange and reset toilet with one wax ring, in Oswego.

Todd Z.

Todd Z. Job Checkin

Repaired toilets in master bath oswego IL

Repaired toilets in master bath oswego IL

Todd Z.

Todd Z. Job Checkin

Rodded out floor drain in employee bathroom oswego IL

Rodded out floor drain in employee bathroom oswego IL

Todd Z.

Todd Z. Job Checkin

Installed new fill valve in 1st floor toilet oswego IL

Installed new fill valve in 1st floor toilet oswego IL

Charlie P.

Charlie P. Job Checkin

Day 3 of basement repiped. Cut out several old gate valves and unions, then replaced with new copper. Ran PVC vents line for floor drain and grey box. Tied into existing vent stack. Installed 5 angle stop shut-off valves. Install dishwasher tailpiece. Piped-in T and extra angle stop for dishwasher water feed.

Day 3 of basement repiped. Cut out several old gate valves and unions, then replaced with new copper. Ran PVC vents line for floor drain and grey box. Tied into existing vent stack. Installed 5 angle stop shut-off valves. Install dishwasher tailpiece. Piped-in T and extra angle stop for dishwasher water feed.

Charlie P.

Charlie P. Job Checkin

Day 3 of basement repiped. Cut out several old gate valves and unions, then replaced with new copper. Ran PVC vents line for floor drain and grey box. Tied into existing vent stack. Installed 5 angle stop shut-off valves. Install dishwasher tailpiece. Piped-in T and extra angle stop for dishwasher water feed.


Charlie P.

Charlie P. Job Checkin

Day 3 of basement repiped. Cut out several old gate valves and unions, then replaced with new copper. Ran PVC vents line for floor drain and grey box. Tied into existing vent stack. Installed 5 angle stop shut-off valves. Install dishwasher tailpiece. Piped-in T and extra angle stop for dishwasher water feed.


Nick B.

Nick B. Job Checkin

Installed new 40 gallon state select water heater

Installed new 40 gallon state select water heater