Day 3 of basement repiped. Cut out several old gate valves and unions, then replaced with new copper. Ran PVC vents line for floor drain and grey box. Tied into existing vent stack. Installed 5 angle stop shut-off valves. Install dishwasher tailpiece. Piped-in T and extra angle stop for dishwasher water feed.