Took measurements and pictures of door on Walk-In Cooler to send to fabricators to see about getting a ramp fabricated. Customer also wants handle ordered. CHG w38 series (Frank door) 1/25/19 Drilled holes in tiled floor and installed anchors and fastened down ramp. Also replaced door latch.