2 system tune up- Checked operations of Upstairs and Main level 2017 Ruud HP/AH. Replaced filters, checked capacitor outputs and amp drawls, checked refrigerant levels and auxiliary heat, triggered safety switches and defrost modes, Washed condensers Checked delta T, and cleared drain lines. Systems are operating properly at this time. 2-16x20x5, pics uploaded Also replaced the thermistors for both air handlers, parts are still under manufacture warehouse so labor will only be charged Sending invoice to email for payment