2 System CCM- Checked heating operations of systems. Replaced filters, checked capacitor outputs and amp drawls, Inspected heat exchangers, Checked delta T, triggered safety switches, cleaned flame sensors,cleaned burners, and cleared drain line. systems are operating properly at this time. 20x25x1, 16x20x5, pics uploaded