Cut down baseboard. Drained the kitchen zone. Removed baseboard from the wall. Cut down to proper length. Reinstalled and raised baseboard to account for the new flooring. Filled and purged system. All systems operating properly at this time. Have a wonderful fall, Brennan and Brad