Removed old geothermal unit and cut out old flow center. Install new geothermal unit and flow center. Reconnect ductwork, electrical, loopfield piping, and domestic water. Fill and purge loopfield and preform start up on geothermal system. Went through operation and filter care with the customer. Geothermal system is operating properly at this time. Thank Brad