Customer requested replacement of air conditioning system. Ordered the equipment, applied for permits, and on the installation date, Removed the old system, tied in the new Ai Handler to the existing ductwork, installed the condenser, thermostat, surge protector, and copper line set, purged the copper lines while brazing the joints, and pressure tested the system. Working to Manufacture specifications.