Installed new Air Conditioning System, Started by removing original equipment. Installed new wood deck. Installed air handler, heater, float switch, copper line set, thermostat, heat pump condenser and tie downs. Brazed all lines while nitrogen purging. Pressure tested. Wired in new system. Started system and checked operation. Operating to manufacturer’s specifications.