Customer approved installation of new Air Conditioning System. Upon arrival removed original equipment and nitrogen flushed existing copper line set. Installed auxiliary drain pan, air handler, heat pump condenser, heater, float switches and thermostat. Brazed all lines while nitrogen purging. Pressure tested. Evacuated system. Wired in new system. Started system and checked operation. Operating to manufacturer’s specifications. Delivered permit for inspection and extended warranty