New Air Conditioning System installation. As part of installation added new air handler deck. New air handler, filter rack, heater, float switch, thermostat, hurricane pad and heat pump condenser. After Installation pressure tested new connections, Evacuated system. Opened isolation valves and started system. Checked operation. System operating to manufacturer’s specifications. Requested and delivered extended mfr. warranty.