Installed new Air Conditioning System Removed original equipment. Leveling ground for new hurricane pad. Installation of new heat pump unit, tie downs and thermostat. Connecting high and low voltage electrical wiring. Starting system and checking operation in fan/ cool/ heat/ emergency heat modes. System Operating to manufactures specifications.