Arrived to install hall tub and shower trim on moen positemp valve, a So install drain trim. Install customer 3 lavatory popup assemblies and tested for leaks. Install new angle stops for kitchen faucet in order to connect customer faucet. Went to straighten tubular drain and pipe came apart from wall pipe. Replaced necessary drain fittings and ptrap to fix, tested for leaks and operation.