Completed Goodman air handler and heat pump installation. Installed 10kw heat pack. Adapted to existing ductwork, lineset (flushed), electrical. Ran new pvc drain with trap and clean out. Replaced thermostat with Honeywell T4. Outside replaced disconnect box, and pad. Re insulated suction line. Cycled and tested, system working properly at this time. BILLOUT