Installed Lenox equipment, project included new high voltage whip to the condenser, installed new condenser pad. Adapted to refrigerant lines and used r-11 acid flushed. Adapted to supply and return added 16x25x4 filter rack. Adapted to high voltage added new switch receptacle. Installed new condensate pump with new vinyl. Ran new flu pipe and adapted to gas line. Reused thermostat. System is tested and working properly at this time.