Installed new Goodman equipment. Project included new condenser pad, with new high voltage disconnect box with new high voltage wire. Flushed and adapted to refrigerant lines. Adapted to supply and return plenum. Flushed out drain lines and adapted to them. Added new 220volt switch on the air handler. Installed new overflow pan with safety switch’s. Installed customer supplied thermostat. System is tested and working properly at this time.