Installed new Goodman equipment. Project included new condenser pad with heat pump risers. Installed new high voltage disconnect box with new high voltage wire. Ran new copper refrigerant lines. Adapted to supply, installed new return box with new return drop. With 16x20x1 filter. Ran new drain lines adapted to high voltage and low voltage. With 9.5 kw heat kit. Reused thermostat. System is tested and working properly at this time.