Installed new Goodman equipment. Installed new condenser pad with new high voltage wire going to the condenser. Adapted to supply and return. 16x25x1 filter rack. Adapted and flushed refrigerant lines. Blew the drain line out and adapted to them, adapted to gas pipe, and flu pipe. Reused high voltage added new switch. Installed new Honeywell thermostat. System is tested and working properly at this time.