Completed 2 system (air handler, condenser) installation. Goodman equipment was installed in the addition attic, and main attic. Adapted to existing connections. Outside replaced disconnect boxes, whips, and pads. Inside replaced thermostats with nest thermostats. Cleared and flushed all drains. Flushed all line sets. Cycled and tested both systems, both working properly at this time.