Cleaned and checked steam boiler. Inspected and cleaned heat exchanger. Checked flu piping and draft. Cleaned burners, pilots, and flame sensors. Drained water to test low-water cut off. OK. Refilled and tested operation. Customer declined combustion analysis at this time. Plans to replace.