1276 N. Warson
St. Louis, MO 63132
(314) 352-1111

Job Locations
for lake saint louis, mo


Map of Lake Saint Louis MO
John M.

John M.


Job Checkin

Cleaned and checked air conditioner. Checked drain. Checked voltage and amperage draw of motors. Tested capacitors. Checked Freon level: superheat: T+11. Checked filter. Testing basement pressure with new make up air vents installed: .003 inches water column. Compressor: 7.45A . Condenser fan: 0.7A . Blower: 3.6A. ambient: 88 . liquid line: 98 . suction line: 57. metering device: piston . Suction pressure:71(42) . Return air: 73.5 . supply air: 54.5 . wet bulb: 62. Cleaned condenser coil. Compressor is noisy. Freon level is slightly low. Superheat: target +11. Last year super he was target +5. System uses older type of Freon. Work suggested: filter cover. Recommend budgeting for new air conditioner. Lisa is scheduling a project manager.