Install Gas Heating Electric Cooling Packaged Rooftop Unit. Includes crane lift and electrical reconnect. Reconnect gas line, new gas regulator, new air filters, crane lift, disposal of old equipment, 5 Year Compressor & Heat Exchanger Warranty, 1 Year Parts Warranty, 1 Year Labor Warranty, Start Up and test. Not Included: Duct Work Roofing Structural, mechanical or engineering drawings Existing gas piping other then hookup Gas meter upgrades or service Additional permits if required Smoke detectors & remote test station if required by inspector